Situated in Changle, Weifang, Shandong, this 5,949.72 m² workshop is Building 13 of a 600,000-ton/year veterinary feed additive base. The client prioritized minimizing steel consumption without compromising safety. Through coordinated optimization of column grids, variable-section members, lightweight aluminum-zinc envelopes, and refined connections, the team achieved a significant reduction in steel usage. After passing third-party inspection with all deflection and displacement indices within code limits, the client was sufficiently satisfied to commission the Phase II facility, establishing a replicable benchmark for cost-efficient industrial design.


Completed feed additive workshop with light gray corrugated steel roof, insulated wall panels and roof ventilatorInterior steel frame of a production workshop with columns, roof beams, wall bracing, insulated panels and high-level side windows


Project Overview

The Feed Additive Production Workshop is Building 13 of a 600,000-ton/year veterinary feed additive base, located in Changle, Weifang, Shandong, China, with a floor area of 5,949.72 m². It is a single-storey steel structure production building designed around a clear, efficient column grid.

As one building within a larger production base, the workshop had to meet demanding requirements: adequate clear span for production lines, a lightweight envelope to reduce foundation and steel costs, and fast delivery so the base could start operations on schedule. Derun Heavy Steel supplied the structure as part of our integrated design-fabrication-installation service.

Feed additive production involves clean, controlled interior environments. The structural solution therefore had to support a tight, well-insulated envelope while keeping the frame itself as economical as possible – a balance that defined every engineering decision on this project.

Client Requirements & Project Challenges

The client's overriding priority was to minimize steel consumption without compromising safety. With production bases typically requiring multiple similar workshops, every kilogram of steel saved per building is multiplied across the whole base.

The engineering challenge was to achieve this economy while keeping deflections and stability within code limits. Column grids, member sections and connection details all needed to be optimised together, rather than simply applying a standard design.

Derun's Engineering Solution

Derun Heavy Steel addressed the cost challenge through coordinated structural optimisation across four areas: column grid rationalisation, variable-section members, lightweight aluminum-zinc envelopes, and refined connection details. Each element was tuned to carry its actual load with minimum material while preserving adequate stiffness and stability.

Variable-section members allow bending capacity to follow the moment diagram of the frame, avoiding the waste of constant-section members in low-stress zones. The lightweight aluminum-zinc envelope reduces dead load on the frame and foundations, creating a compounding saving across the structure.

All members use Q235B/Q355B steel with international equivalents available on request. Fabrication in our own factory (monthly capacity above 2,000 tons) allowed precise control of member dimensions and connection quality, supporting the tight tolerances needed for the optimised design.

Key Project Data

ItemDetails
Project NameFeed Additive Production Workshop (Building 13)
LocationChangle, Weifang, Shandong, China
Floor Area5,949.72 m²
Production Base600,000 tons/year veterinary feed additive
Structure TypePortal frame steel structure
Main MaterialQ235B/Q355B steel (ASTM/EN equivalents available)
EnvelopeLightweight aluminum-zinc coated cladding
Design ObjectiveMinimized steel consumption with full code compliance
VerificationThird-party inspection, deflection/displacement within code limits
WarrantySpecified in the project contract

Quality Control & Delivery

Because the design was deliberately economical, fabrication accuracy became critical – a member dimension error that is acceptable in a conservative design may not be in an optimised one. Every member was therefore produced under strict shop inspection, with connection holes and member lengths verified before dispatch.

On completion, the structure passed third-party inspection with all deflection and displacement indices within code limits, confirming that the material savings did not come at the expense of safety or serviceability.

Project Outcome

The client was sufficiently satisfied with the result to commission the Phase II facility, validating the cost-efficient design approach. The workshop established a replicable benchmark for industrial design where economy and safety are achieved together rather than traded against each other.

For Derun Heavy Steel, this project demonstrates that prefabricated steel buildings can be competitively priced without hidden compromises – a message directly relevant to clients comparing suppliers on cost.

Project Execution Notes

Feed additive production environments are corrosive by nature. Raw materials, process additives and cleaning chemicals can affect both the steel structure and the fasteners over time, so the specification for this workshop went beyond a standard industrial building. We discussed the expected internal environment with the client early on and adjusted the coating system, the grade of exposed secondary members and the sealing details around wall and roof penetrations accordingly.

Ventilation was another design point. Dust-laden air and process vapour need controlled extraction rather than natural cross-ventilation alone, and the roof structure had to support ductwork, filtration units and the occasional maintenance platform without eating into the clear height the production line required. We sized the primary frame and the roof bracing with those loads included from the drawing stage, rather than adding them later.

For clients in feed and additive production, the practical takeaway is to describe the process environment honestly at the enquiry stage. A workshop built to a generic industrial specification will cost less upfront, but a frame selected for the actual chemicals, dust and ventilation loads will require less maintenance and perform more reliably over its service life.

Frequently Asked Questions

1. Can Derun optimise the design to reduce steel cost?

Yes. We routinely optimise column grids, member sections and connections to reduce steel consumption while maintaining full compliance with applicable standards.

2. What is the typical clear span for a production workshop?

Clear spans are customized per project, based on your production line layout, crane requirements and storage needs.

3. How fast can a workshop be delivered?

Because the frame is fabricated in our factory while foundations are prepared on site, overall delivery is significantly faster than conventional construction. Exact timing depends on size and scope.

4. Can you build a similar workshop for our production base?

Yes. Our design and fabrication approach scales across single buildings or multi-building production bases, with consistent quality and economy.

5. What envelope options reduce dead load and cost?

Lightweight aluminum-zinc coated steel cladding systems are commonly used; specific choices are customized per project and climate.

6. Do you provide third-party inspection documentation?

Yes. Completed projects are verified by third-party inspection where required, with documentation provided to the client.

Related Steel Structure Solutions

Start Your Steel Structure Project

1. Send Your Requirements – share your production area, building size or drawings through the contact form or email; our engineers confirm the key parameters with you.

2. Review Design & Quotation – we prepare the optimised structural design and itemized quotation; you review, adjust and confirm the order.

3. Fabrication & Delivery – production starts after confirmation; your workshop is fabricated, inspected, packed and delivered on schedule with installation support.

Get a Quote

Planning a production workshop or a multi-building manufacturing base? Send your requirements to our engineers, and you will receive a response as soon as your requirements are confirmed.

Get In Touch With Us