Derun Technology Industrial Park
Located in Changle, Weifang, Shandong, this phase covers 23,191 m² as part of a master-planned industrial park comprising over 20 buildings with a total floor area of 160,000 m², all employing portal frame structures. Leveraging integrated design-fabrication-installation capabilities, Derun Heavy Steel coordinated procurement, fabrication, and erection to deliver the entire complex within 14 months. The successful delivery of this project demonstrates the company's comprehensive strength in large-scale industrial clusters, cementing its competitive edge in turnkey industrial park development.
![]()
![]()
Project Overview
Derun Technology Industrial Park is a large-scale, multi-building steel structure complex located in Changle, Weifang, Shandong, China. This phase covers 23,191 m² as part of a master-planned industrial park that comprises over 20 buildings with a total floor area of 160,000 m², all employing portal frame structures.
As a turnkey industrial park development, the project required coordinated planning across multiple workshop buildings, shared infrastructure and consistent structural performance across every unit. Derun Heavy Steel acted as the single EPC partner, integrating design, fabrication and installation so that the client received one accountable point of delivery rather than coordinating separate contractors.
Industrial parks of this scale demand more than individual buildings – they require a system. Load paths, crane provisions, envelope continuity and future expansion routes all had to be considered as one master plan. This is exactly the scenario where prefabricated steel construction delivers its strongest value: speed, predictability and repeatability across buildings.
Client Requirements & Project Challenges
The client's primary requirements were delivery certainty and overall programme control. With more than 20 buildings planned for the complete park, any delay in one phase would affect the entire master schedule. The site also needed efficient logistics during erection, with materials and cranes moving between multiple building positions.
Because the park comprises multiple portal frame buildings, the engineering challenge lay in standardising design while keeping each unit fit for its intended production use. Column grids, eave heights and envelope systems had to be rationalised so that fabrication could proceed in efficient batches while each building still met its functional requirements.
Derun's Engineering Solution
Derun Heavy Steel's integrated design-fabrication-installation capability allowed the team to coordinate procurement, fabrication and erection as one continuous process. Components were prefabricated in our own factory with a monthly output capacity above 2,000 tons, then transported to site in planned erection sequences.
All buildings adopt portal frame structures, using Q235B/Q355B steel with international equivalents such as ASTM A36/A572 and EN S275/S355 available on request. Secondary members, roof and wall cladding follow the same standardised system across the park, which simplifies procurement, speeds up installation and makes future maintenance predictable.
By sequencing foundation works, steel delivery and cladding installation across the site, the entire complex was delivered within 14 months. The coordination of multiple erection crews allowed different buildings to progress in parallel, compressing the overall schedule without compromising site safety or quality control.
Key Project Data
| Item | Details |
|---|---|
| Project Name | Derun Technology Industrial Park |
| Location | Changle, Weifang, Shandong, China |
| Phase Area | 23,191 m² |
| Master Plan | 20+ buildings, total floor area 160,000 m² |
| Structure Type | Portal frame steel structure |
| Main Material | Q235B/Q355B steel (ASTM/EN equivalents available) |
| Construction Approach | Design-fabrication-installation EPC (turnkey) |
| Delivery Schedule | 14 months for this phase |
| Surface Treatment | Customized per project |
| Warranty | Specified in the project contract |
Quality Control & Delivery
Quality control across a multi-building project starts with fabrication consistency. Every member is produced in our own workshop with coded marking, dimension checks and welding inspection before dispatch. On site, anchor bolt verification, column alignment and torque checks for high-strength bolts follow the same documented procedure for every building.
Delivery within 14 months was achieved through weekly planning between the factory and site teams, with erection sequences matched to foundation readiness. Regular coordination meetings kept procurement, fabrication and installation aligned, reducing idle time and ensuring a smooth handover phase by phase.
Project Outcome
The successful delivery of Derun Technology Industrial Park demonstrates comprehensive strength in large-scale industrial clusters. The client received a fully coordinated complex under a single contract, with predictable quality across all buildings and a compressed overall schedule.
For Derun Heavy Steel, the project cements our competitive edge in turnkey industrial park development. The same master-planning approach – standardised portal frames, batched fabrication and parallel erection – can be applied to export industrial zones, logistics parks and manufacturing clusters worldwide.
Project Execution Notes
An industrial park is more than one building — it is a group of structures that have to go up on the same schedule, share the same site access, and hand over to different clients on different dates. For this project, our team coordinated the steel structure erection across multiple buildings while the site was still being prepared, so that once the foundation works reached a usable stage, the frame could go up without waiting.
We also planned the connection between production buildings and the logistics corridor in the early drawing stage, rather than adjusting it on site. This matters because a steel frame is fast to erect, but once the columns are set, shifting a door opening or a loading bay means rework on both the structure and the civil works. Resolving those details in the model first saved time on site and kept the handover sequence predictable for the client.
The result was a completed park where each building could be commissioned independently, without the construction schedule of one unit blocking the next. For clients planning multi-building developments, we recommend agreeing the erection order, crane position and material storage layout before steel fabrication starts — these decisions shape the site workflow far more than the individual building drawings.
Frequently Asked Questions
1. Can Derun build a multi-building industrial park for overseas clients?
Yes. We provide complete design, fabrication and installation for industrial parks and multi-building complexes, with export packing and on-site erection guidance available for overseas projects.
2. What is the typical schedule for an industrial park phase?
Delivery depends on building count, area and site conditions. Our integrated approach compresses overall programmes compared with conventional construction; specific timelines are confirmed once your requirements are defined.
3. Can the buildings be extended in the future?
Yes. Portal frame buildings can be designed with expansion interfaces, allowing additional bays or adjacent buildings to be added later subject to engineering review.
4. What steel grades are used?
Q235B/Q355B steel is standard, with international equivalents such as ASTM A36/A572 and EN S275/S355 available on request.
5. How is quality controlled during fabrication?
All members are produced in our own factory with coded marking, dimensional checks and welding inspection before dispatch to site.
6. Can Derun handle design for local codes overseas?
We can adapt structural design to the applicable standards of the destination market, including wind, snow and seismic loading requirements.
Related Steel Structure Solutions
Start Your Steel Structure Project
1. Send Your Requirements – share your building type, area or site drawings through the contact form or email; our engineers confirm the key parameters with you.
2. Review Design & Quotation – we prepare the structural design and itemized quotation; you review, adjust and confirm the order.
3. Fabrication & Delivery – production starts after confirmation; your steel structure is fabricated, inspected, packed and delivered on schedule with installation support.
Get a Quote
Planning an industrial park or a multi-building steel structure complex? Send your requirements to our engineers, and you will receive a response as soon as your requirements are confirmed.