Wanqing New Materials Seamless Roof Workshop
This 15,775.84 m² workshop in Changle, Weifang, Shandong features a 35-meter ultra-long polyurethane sandwich panel roof system with no transverse laps, fundamentally eliminating leakage risks and thermal bridges at joints. Concealed fasteners and precision waterproofing details deliver a seamless, attractive roof surface. On-site testing confirmed that thermal performance fully meets the temperature control demands of new materials production, making this project a representative solution in Derun Heavy Steel's large-span industrial roofing portfolio.
![]()
![]()
Project Overview
The Wanqing New Materials Seamless Roof Workshop is a 15,775.84 m² steel structure building in Changle, Weifang, Shandong, China, distinguished by its 35-meter ultra-long polyurethane sandwich panel roof system installed with no transverse laps across the full span.
Conventional metal roofs require laps where panels meet end to end, and every lap is a potential leak path and a thermal bridge. Over a long-span workshop, lap details multiply across the roof, increasing both leakage risk and energy loss. The seamless roof system used on this project eliminates transverse laps altogether, fundamentally removing these risk points.
For a new materials production facility, roof performance directly affects the interior climate: temperature control, condensation avoidance and airtightness all depend on the roof system performing as one continuous barrier.
Client Requirements & Project Challenges
The client needed a very large workshop (15,775.84 m²) with a roof that would stay watertight and thermally consistent over decades of production. With a 35-metre span to cover, the challenge was to achieve long-run roof performance without the leak and thermal-bridge risks of conventional lapped panel systems.
Long roof panels also raise handling and installation precision demands – a slight misalignment at one end magnifies across the panel length, so installation tolerances and weatherproofing details had to be engineered with exceptional care.
Derun's Engineering Solution
Derun Heavy Steel selected an ultra-long polyurethane sandwich panel system spanning 35 metres with no transverse laps. Polyurethane cores provide high insulation performance, while the continuous panel surface eliminates the joint thermal bridges that undermine conventional roofs.
Concealed fasteners were used throughout, removing exposed fixing points and their associated leak risks while delivering a clean, seamless visual surface. Precision waterproofing details – flashings, ridge sealing and perimeter detailing – complete the weather barrier so that the entire roof performs as one continuous system.
The supporting frame uses Q235B/Q355B steel with international equivalents available on request, fabricated in our own factory with monthly capacity above 2,000 tons and erected to the tight tolerances the roof system demands.
Key Project Data
| Item | Details |
|---|---|
| Project Name | Wanqing New Materials Seamless Roof Workshop |
| Location | Changle, Weifang, Shandong, China |
| Floor Area | 15,775.84 m² |
| Roof System | 35 m ultra-long polyurethane sandwich panels, no transverse laps |
| Fixing Method | Concealed fasteners, precision waterproofing details |
| Structure Type | Large-span steel workshop |
| Main Material | Q235B/Q355B steel (ASTM/EN equivalents available) |
| Thermal Performance | Verified by on-site testing for production temperature control |
| Surface Treatment | Customized per project |
| Warranty | Specified in the project contract |
Quality Control & Delivery
Quality control on this project centred on the roof system's installation precision. Panel positioning, fastener alignment and sealant application were checked against the installation specification, because seamless performance depends on correct execution at every step.
On-site testing confirmed that thermal performance fully meets the temperature control demands of new materials production, verifying the roof system's insulation integrity across the completed workshop.
Project Outcome
The completed workshop provides a watertight, thermally consistent production environment at large scale, with the leakage and thermal-bridge risks of conventional roofs designed out of the system. The project represents a benchmark solution in Derun Heavy Steel's large-span industrial roofing portfolio.
For clients with large production halls, the same seamless roof approach is available for export projects, with panel supply and installation guidance included in our scope.
Project Execution Notes
New material production often requires a cleaner, better-controlled internal environment than a general warehouse, and the roof is where that control starts. For this workshop, the seamless roof system was chosen to reduce leak points, because even small roof penetrations become a contamination risk in sensitive material production. We coordinated the roof purlin layout, the seam positions and any skylight or ventilation penetrations in the drawing stage so that the number of joints was kept to a minimum.
Lighting was the other design point. A workshop that relies entirely on artificial light costs more to run, but too much uncontrolled daylight can heat up the space or create glare on sensitive production areas. We balanced the roof skylight area against the insulation and ventilation design, so that the building could be opened up on mild days and closed down when the process required a controlled temperature.
For clients in new materials, chemicals or powder production, the practical point is this: the roof is not just weather protection, it is part of the process envelope. A roof system selected for cleanability, low leak risk and balanced daylight will serve a production line better than the cheapest panel system, even if the upfront cost is slightly higher.
Frequently Asked Questions
1. What is the maximum roof panel length available?
Ultra-long panels of 35 metres were used on this project; maximum lengths are customized per project based on logistics and installation planning.
2. How does the seamless roof prevent leakage?
By eliminating transverse laps and using concealed fasteners with precision waterproofing details, the roof removes the primary leak paths found in conventional lapped systems.
3. Is thermal performance tested after installation?
On-site testing is carried out to verify that the completed roof meets the temperature control requirements of the facility.
4. Can the same roof system be used for overseas projects?
Yes. Panel supply, installation guidance and the associated structural scope are available for export projects.
5. What steel grades are used?
Q235B/Q355B steel is standard, with international equivalents such as ASTM A36/A572 and EN S275/S355 available on request.
6. Does the seamless roof cost more than a conventional system?
Cost depends on span, panel specification and installation logistics; the approach is customized per project and compared against conventional systems before selection.
Related Steel Structure Solutions
Start Your Steel Structure Project
1. Send Your Requirements – share your building area, span and roof performance needs through the contact form or email; our engineers confirm the key parameters with you.
2. Review Design & Quotation – we prepare the structural and roofing design with itemized quotation; you review, adjust and confirm the order.
3. Fabrication & Delivery – production starts after confirmation; your workshop is fabricated, inspected, packed and delivered with installation support.
Get a Quote
Planning a large production hall with demanding roof performance? Send your requirements to our engineers, and you will receive a response as soon as your requirements are confirmed.